Orbital data centers are built to last 30 years, around AI chips that are outdated in five. StarCompute is a solar-powered compute station whose GPU cartridges a robot replaces every four years, so the station gets faster with age instead of being scrapped.

One node, thirty years: what has to be launched

Year 0
Single-use satellitewhole satellite replaced every 5 years
5,200kg launched
StarComputeone station, chips refreshed every 4 years
5,200kg launched
5,200 kg station, 1,000 kg per chip refresh, launch at about $1,400 per kg.
Fleet size

The satellite outlives its chips six times over

Every new GPU generation does far more work per watt, so older chips stop earning their keep within about five years. Most orbital data centers announced so far seal the chips into the satellite. When the chips age, the solar arrays, radiators and structure are thrown away with them.

About 81% of a node's mass could keep working for 30 years. Only the compute ages.

How long each part stays useful

Structure
30 years
Solar arrays
30 years
Radiators
30 years
Arm and laser links
30 years
AI chips
~5 years

Design lifetimes from the StarCompute node model.

A station that is upgraded, not replaced

The long-lived hardware goes up once. Compute travels in sealed cartridges that a robotic arm can exchange while the rest of the station keeps running.

40 kWStation, 30-year lifeSolar power, radiators, robotic arm, laser links and thrusters that hold its orbit.
10 kWCartridge, 4-year stayFour next-generation data center GPUs and two CPUs, with their own sealed cooling loop. Four cartridges per station.
~3 hoursPer cartridge swapDone by the arm, with no astronauts and no fluid lines to connect.
1,000 kgPer chip refreshInstead of launching a new 5,200 kg satellite.

How a refresh works

Station Servicer
Four-year-old cartridgeNew cartridge

The hard part is cooling you can unplug

Each cartridge puts out 10 kW of heat. Moving that much heat normally means fluid lines, and reconnecting fluid lines by robot in orbit invites leaks. Our cartridge keeps its coolant sealed inside and hands its heat to the station through a dry contact. No fluid ever crosses between them.

Fluid couplingStarCompute dry joint
Fluid lines to connect in orbitAt every swapNone
Leak risk when a cartridge is exchangedYesNone, the coolant never leaves the cartridge
Robot motion neededMate and seal each lineOne straight lift
Station during the swapLoop drained or isolatedKeeps running

Patent pending. A US provisional application covering the joint and the robotic swap sequence was filed on 16 November 2026. Technical details are available to investors and partners on request.

Where the engineering stands today

We have a complete engineering model of the node, analysed for launch, heat and 30 years of operation. Nothing has been hardware-tested yet, and we say so.

Node design1,477-part model and a 214-page design reviewComplete
Launch loadsThree rockets analysed, every strength margin positiveAnalysed
Chip temperatureAt or below 85 °C, simulated orbit by orbit across 30 yearsSimulated
Cooling jointCarries 2 to 3 times the peak heat load in finite-element analysisAnalysed
Cooling reliability0.25% chance of losing all cooling in 30 years with no servicingAnalysed
Hardware testingVacuum test of the cooling joint is the first milestone of this roundNext

What happens next

  1. 2026

    Node designed

    Full engineering model, analysed and independently re-checked.

  2. November 2026

    Patent filed

    US provisional application on the cooling joint and swap sequence.

  3. This round

    Joint tested in vacuum

    Build the cooling joint and prove it at full heat load.

  4. After that

    Swap demonstrated

    A robotic cartridge exchange on the ground, then the first node in orbit.

A team that has built and flown space hardware

Akash Singh

Co-founder and CEO

  • Former spacecraft mechanisms engineer at ISRO, on the 6 m unfurlable antennas of GSAT-6 and GSAT-6A
  • Built a tension-monitoring mechanism that flew on both satellites (2015 and 2018)
  • PhD, University of Illinois Urbana-Champaign
  • Leads the station, robotic arm and cooling joint
LinkedIn

Dinesh Dhankhar

Co-founder and COO

  • Staff Engineer at Analog Devices
  • Ten years at ISRO on spacecraft checkout
  • PhD, Texas A&M University
  • Leads electronics, sensing and power
LinkedIn

Anish Gupta

Co-founder and CTO

  • Lead Data Scientist at CVS Health, building its agentic AI platform
  • Runs machine-learning operations on AWS and Azure
  • MS, University of Illinois Urbana-Champaign
  • Leads AI infrastructure, software and data links
LinkedIn

Questions investors ask us

Why not launch a new satellite every five years?

Because most of it is still good. Relaunching the 81% that has not aged costs about 19,000 kg of extra launch mass per node over 30 years, roughly $27M at $1,400 per kg, and it scales with every node in the fleet.

What exactly is patent pending?

The cooling joint that lets a robot disconnect and reconnect a 10 kW cartridge with no fluid connections, and the swap sequence around it. A US provisional application was filed in November 2026.

How far along are you?

The full node is designed and analysed for launch loads, heat and 30 years of operation. No hardware has been tested yet. The first test is the cooling joint in vacuum, which this round pays for.

Who is this for?

Operators and buyers of compute in orbit who need hardware that stays current, including sovereign and edge AI workloads.

Can we see the product demo?

Yes. Email us and we will send the demo video and the deck.

We are raising our pre-seed round.

It funds the first hardware: the cooling joint, built and tested in vacuum. Ask for the deck and the product demo.